Cycle Time: 2,6 sec
Test: Pop test
Fast changeover by electrical axis
Lever Marking and tag application
Cycle Time: 2,6 sec
Test: Micro leakage seal test whit valve at 45° + close valve or pop test
Fast changeover by programmable electrical axis
Production: 1100-1200 pcs/h
Test: Micro leakage seal test
Complete with sub-assembly rotary table
Production: 1100-1200 pcs/h
Test: Pop test
Complete with sub-assembly rotary table
Production: 1200 pcs/h
Test: Body leakage seal test + Assembled valve leakage seal test + Incremental test to verify opening level
Valve calibration system
Complete with packaging machine
Production: 2200 pcs/h
Test: Micro leakage seal test
Straight and angle valve assembling
Assembling two valves simultaneously and test on comulated pallet system
Production: 1800-200 Pcs/h
Test: Pop test
Assembling two valves simultaneously